WSS between ch 96+700 to ch 97+200
WSS between ch 86+500 to ch 87+00
WSS between ch 84+400 to 81+800
WSS between ch 84+00 to ch 84+400
Kundevahal Tunnel South Portal Rob erection in progress
Work yet to start from Ch19520 to 19700
Work yet to start from Ch19+520 to 19+700
Shotcrete at Kundevahal Tunnel South Portal
Ribs erection for Heading at Kundevahal Tunnel South Portal started on today
NH4B -ROB road open for traffic of phase -1 JNPT end
MNRUB-104A slab curing wip
MNRUB-104A curing wip
MNRUB -49 not yet started
Mnb 168 work stand still
MNB -43 not yet started
MNB -23 precast box erection completed
Gawan phata ROB -work stand still
PSC Solid slab PS-17433A
177 MJB end span
Vahale dhumale ROB approach road A2 Side
Vahale dhumale ROB – bow string girder assembly and trussel erection in progress
ROB -KD2 completed miscellaneous work is balance
psc slab PS118 169 c&dmjb
No work
MJRUB -67 work stand still
MJB-177 Precast solid slab
MJB -68E work in progress
Kharbao Yard Blanket work in progress.
Kharbao Viaduct – A1 side – Span P28 – 29
Hill cutting work between ch 56+900 to ch 57+120
Hill cutting work at ch88+540 to ch 88+600
Ev2 for Blanket material at ch 86+100
ch. 84+100 to ch 84+450 WSS
ch 96+700 to ch 97+200 WSS
01 Up Co. – WSS
Viaduct-163D P30(LHS) pier shaft 1st lift concrete pouring started
Viaduct-163D P12 raft concrete pouring started
ROB BHIWANDI – WIP
PSC Solid slab PS-216342B concreting done 300322.
MNRUB 121 – YTS (2)
MNB 121A – WSS (2)
CTP-11 Kharbao Viaduct
MJRUB 127 -YTS
MJB 151 WSS
MJB 146 & 147B A2 Pedestal concrete pouring started
MJB 142 WSS
MJB 139 – – WIP (Work resumed
MJB 138 – Main Track – WSs
MJB 137 – WSS since 28-May
MJB 136 – WSS
MJB 134 – WSS
MJB 125B – WSS – View from ROW
MJB 119A A2 abutment
MJB -68E psc I girder -05 casting completed during night shif
MJB 2 Up Co. Construction WSS – View from JNPT End
Kopar Viaduct – WIP
Kopar Viaduct WIP
Kharbao Viaduct -RFO Span (P37 P38)
Kharbao Viaduct WIP (P35 to A1. Deck slab in progress at P35-34 Span)
Kharbao RFO – P37-38 WIP
CTP-11 MJB 138
Ch76+700 to ch 67+340 WSS
Ch 70+700 to ch 71+100 WSS
Ch 65+250 to ch 65+700 WSS
Ch 59+100 to ch 59+550 WSS
Ch 58+650 to ch 59+030 YTS
Ch 57+500 to ch 58+650 WSS
ch 15+760 to 15+770 LHS side
Bhiwandi ROB Pipeline – U Trough construction completed _View from VAITARNA End
142B not yet started
119B – YTS_View from ROW
Viaduct-163D P23
Viaduct-163D P12 raft
Viaduct 172 wip
South tunnel south portal , WSS portal work
South tunnel , wip
Rob2 vs2, wip
P31A Pilecap reinforcement fixing work in progress Kalamboli RFO A1 side.
North tunnel south portal, collapse section wip
North tunnel , lining work in progress
North deep cut work stand still
Mnrub 171
MNRUB -68F box 1span wearing coat casting completed
Mnb 170c wss
Mnb 170b work stand still
Mnb 170a work stand still
Mnb 170 work stand still
Mnb 169 , WSS
Mnb 168, WSS
MNB -23 precast box erection in progress
MNB – 26
Mjb 178 wip
Mjb 177 work stand still
Mjb 169c&d, slab launching wip
Mjb 169A , work stand still
Kundevahal Tunnel South Portal excavation
Kundevahal Tunnel North Portal face preparation is standstill
Isolated tunnel , WSS
Isolated deep cut, wip
Ch95+835 to 95+840 (RHS)
Ch 91+025 to ch 91+330 YTS
Ch 86+550 to ch 87+110 WSS
Central deep cut, WSS
Casting yard, virar, wip
177 mjb
Solid slab PS1 Errection Started at MJB 169C&D(P2P3)
PSC Solid slab PS-173 33A concreting done 299322.
NH4B – ROB 2 nd layer DBM in progress of 12.5 m carriageway
MNB -42C box wall JNPT
Kalamboli RFO Pile cap P-31A rf placing start.
Girder errection 4350217224
Ch 29+566 to 29+580
NH4B – ROB 2 nd layer DBM in progress of 12.5 m carriageway
Viaduct-163D P30 (RHS) 1st lift concrete pouring started
PSC Solid slab PS-216242B concreting done 298322.
NH4B -ROB laying of DBM 1st layer in progress of 12.5m carriageway
NH4B -ROB 1st layer of DBM complete 2nd layer in progress of 12.5 m carriageway
MNB – 21
Viaduct-163D P30 (RHS) 1st lift concrete pouring started
ROB 142B not yet started
PSC Solid slab PS-216242B concreting done 298322.
North deep cup work stand still
NH4B -ROB laying of DBM 1st layer in progress of 12.5m carriageway
NH4B -ROB 1st layer of DBM complete 2nd layer in progress of 12.5 m carriageway
NH4B-ROB.
NH4B -ROB laying of BC in progress of 7.6 m carriageway
MNB -21 U trough raft casting completed
MNB -15 U-type Rwall 1st lift casting completed
WSS between ch 84+00 to 84+450
WSS between ch 61+700 to ch 61+900
WSS between ch 57+600 to ch 57+780
MNRUB 121 – YTS
MNRUB 119B – YTS – View from ROW
MNB 121D – YTS
MNB 121C – YTS (Construction work to commence.)
MNB 121A – WSS
Kopar Viaduct View from A1 Side
Kopar Viaduct P12-13 Span – WIP – I Girder De-shuttering in progress.
WSS between ch 84+00 to 84+450
WSS between ch 61+700 to ch 61+900
Viaduct-163D P23(LHS)
NH4B-ROB
NH4B -ROB DBM
NH4B -ROB (2)
MRUB-121
MRUB-119B
MNRUB 121 – YTS
MNRUB 119B – YTS – View from ROW
MNB-121D
MNB-121C
MNB-121A
MNB 121D – YTS
MNB 121C – YTS (Construction work to commence.)
MNB 121A – WSS
WSS between ch 86+500 to ch87+00
WSS between ch 81+600 to ch 82+00
WSS between ch 77+800 to ch 78+200
WSS between ch 58+100 to 59+000
WSS between ch 66+600 to ch 67+300
WSS between ch 86+500 to ch87+00
WSS between ch 81+600 to ch 82+00
WSS between ch 77+800 to ch 78+200
WSS between ch 58+100 to 59+000
WSS between ch 57+600 to ch 57+780
WSS between ch 66+600 to ch 67+300
Virar casting yard
Viaduct 172 wip
South tuunel north approach mobile crusher working
South tunnel wip
Rob2 vs2 wip
ROB DT-1
ROB BHIWANDI – WIP (Work resumed
psc slab PS24 169
North tunnel south portal collapse section
North tunnel lining wip
NH4B -ROB -crash barrier 2nd lift casting completed at D point side 12.8 m carriageway
Mnrub 169b
Mnb 170c
Mnb 170a wss
Mnb 170 wss
Mnb 169 wss
Mnb 168
MNB -58 top layer backfilling completed
MNB -23 curing in progress
MJRUB 127 – YTS_ View from ROW
MJRUB -67 work stand still
MJB-119A
MJB-106
NH4B -work in progress
NH4B -ROB layer of WMM in progress of 7.6 m carriageway
NH4B -ROB
MNB 23
MNB – 15
PSC Solid slab PS-37333A
MJB 147 – Work stand still
MNB -63 toe wall casting completed
MNB -58 Toe wall casting completed
MJRUB127-CH.59+407.50-YTS
Kundevahal Tunnel North portal work not yet taken up
Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Cranes- (7)
MNB126A-CH.56+832-WIP
MNB125-CH.56+682-WSS since 06-03-24
MNB125A-CH.55+955-WIP
MNB124-CH.55+317-YTS
MNB124A-CH.55+134-YTS
MNB123A-CH.54+675-WIP
MJRUB 127 – YTS – View from A2-ROW Corner
MJB139-CH.69+396-View from JNPT End-WIP
MJB138-CH.68+447.94-View from IR Side & Vaitarna End-WSS since 13-06-2023 (PSC Solid slab to be commen
MJB-136-CH.65+776.31-(A2)WSS since 29.11.23 (Girders stressing,grouting & launching to be commenced)
MJB134-CH.63+721-(A2)View from Vaitarna side & ROW corner-WSS since 01.02.24 (Girders stressing,grouti
MJB125B-CH.56+152-WSS Since 02.02.24(PSC solid slab yet to be commenced)
MJB 138 – Main Track – WSS; Up Track – WIP – Shoring arrangement completed. Pile chipping in progress at A1; – View from Vaitarna End
MJB 136 – WSS – View from ROW
MJB 134 – WSS _ View from Vaitarna End-Row Corner
MJB 134 – WSS _ View from JNPT End-Row Corner
MJB 125B – WSS – View from ROW
MJB 2 Up Co. Construction WSS – View from JNPT-IR Corner
1UPCO-CH.69+005-WIP
Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Cranes- (5)
MNB -62 floor apron cement grout completed
MNB -33A Abutment A1 final lift concreting in progress
MNB -32 excavation work in progress
MNB -05 IR existing bridge dismantling in progress
Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Cranes- (4)
Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Cranes- (3)
Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Cranes
JNPT ASS building- GF slab concrete started
Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Cranes-
Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Cranes- (2)
MNRUB-119C Raft Foundation 66200 cum concrete pouring wip.
MNB140A-CH.70+495-WSS
MNB125C-CH.56+321-WIP
Kopar Viaduct-P13-P15-Ch.51+047-WSS
kopar Viaduct -P17-A2-Ch.51+047-WIP
Kopar Viaduct -P15-P16-Ch 51+047-WIP
Kopar Viaduct -P12-P13-Ch.51+047-WIP
Kopar Viaduct -P11-P12-Ch 51+047-WSS
Kopar Viaduct -P10-P11-Ch.51+047-WSS
Kopar Viaduct -P9-P10-Ch.51+047-WSS
Kopar Viaduct -P8-P9-Ch.51+047-WSS
Kopar Viaduct -P7-P8-Ch.51+047-WSS
Kopar Viaduct -P6-P7-Ch.51+047-WSS
Kopar Viaduct -P3-P6-Ch.51+047-WSS
Kopar Viaduct -P2-Ch.51+047-WSS
Kopar Viaduct -A2-Ch.51+047-WIP
Kopar Viaduct -A1-P1-Ch.51+047-WSS
Rwall final lift casting completed at ch 8+300 to 8+320 RHS side
Ghawan phata hill cuttingIR permit block from 1730 to 1900cutting work in progress
Concrete pouring started of Return Wall and abutment wall 1st lift at MJB-145 A1 side ch 77+364
MNB125C-CH.56+321-WIP
P-28 viaduct 172 reinforcement placing of pile cap wip
MNRUB133E-CH.63+477-YTS
MNRUB132-CH.61+878-YTS
MNRUB128B-CH.59+607-YTS
MNB137D-CH.67+244-WSS
MNB137C-CH.66+870-YTS
MNB137B-CH.66+612-WSS Since 24.02.24
MNB137A-CH.66+410-WSS
MNB134A-CH.64+162-WIP
MNB133D-CH.62+607-WSS
MNB133C-CH.62+507-WSS
MNB133B-CH.62+348-YTS
MNB133A-CH.62+097-YTS
MNB133A-CH. 63+289-YTS
MNB132B-CH.61+971-WSS since 15-Feb-24
MNB132A-CH.61+594-YTS
MNB131-CH.61+202-WIP
MNB130-CH.61+037-YTS
MNB130A-CH.60+982-YTS
MNB129-CH.60+523-WSS
MNB128-CH.60+222-WIP
MNB128C-CH.59+461-YTS
MNB -13A box wall & top slab concreting in progress
MJB137-CH.67+951.49-(A2)WIP
Kundevahal Tunnel South Portal pipe roofing in progress
Kharvao Viaduct(A1)-CH.1+622-WIP
Ghawan phata hill cuttingIR permit block from 1940 to 2110cutting work in progress
Vahale dhumale ROB – 4 member of bottom cord cleaning and zinc cromate paint completed and thickeness checked
South Tunnel No work
ROB DT-1
North Tunnel No work
MNB142B – work not started
MNB140-CH.70+304-YTS
MNB127D-CH.59+129-WSS from 06-Mar-24.
MNB127C-CH.58+926-YTS (No further progress till date)
MNB127B-CH.58+306-WSS Since 15-02-24
MNB127A-CH.58+088-WSS from 12-Feb-24.
MNB126B-CH.57+246-WSS (No further progress till date)
MNB126A-CH.56+832-WIP
MJB 147 – work stand still
MJB 142 – Work Stand Still
MJB 136 – WSS – View from ROW- ROW Corner
MJB -66 parapet wall concreting in progress of span A1-P1 DL
Isolated Tunnel No work
Gawan phata water pipe line A1 foundation reinforcement in progress
Gawan phata IR block permit 1800 to 1920 cutting in progress
ch 91+025 to ch 91+720 work not yet started
Concrete pouring started of Girder IG-17 (2.4m height) at Viaduct 159.
Work yet to start from Ch19+520 to 19+700
Viaduct- 163D P13 pier shaft 1st lift pouring start
ROB BHIWANDI – WSS – View from JNPT End
RFO-Kharbao-View from JNPT End- P38-WSS Since 21-02-24
RFO-Kharbao- View from Vaitarna End-P37-WIP
MNRUB123-CH.54+787-YTS
MNB125D-CH.56+467-Completed
MNB125-CH.56+682-WIP
MNB124-CH.55+317-YTS
MNB124A-CH.55+134-YTS
MNB123A-CH.54+675-WIP
MJRUB127-CH.59+407.50-YTS
MJRUB 127 – YTS – View from A2-ROW Corner
MJB139-CH.69+396-View from JNPT End-WIP
MJB138-CH.68+447.94-View from IR Side & Vaitarna End-WSS since 13-06-2023 (PSC Solid slab to be commen
MJB134-CH.63+721-S(A1)WSS since 01.02.24 (Girders stressing,grouting & launching to be commenced)
MJB134-CH.63+721-(A2)View from Vaitarna side & ROW corner-WSS since 01.02.24 (Girders stressing,grouti
MJB125B-CH.56+152-WSS Since 02.02.24(PSC solid slab yet to be commenced)
MJB 138 – Main Track – WSS; Up Track – WIP – Shoring arrangement completed.; – View from JNPT End
MJB 134 – WSS _ View from Vaitarna End-Row Corner
MJB 134 – WSS _ View from JNPT End-Row Corner
MJB 125B – WSS – View from ROW
MJB 2 Up Co. Construction WSS – View from JNPT End
Kundevahal Tunnel South Portal face preparation in progress drilling for pipe roofing in progress
Kundevahal Tunnel North portal work not yet taken up
Gavan phataIR permit block from 18.10 to 19.45Cutting work in progress at ch11+130
ch 84+200 to ch 85+00 WSS
ch 66+600 to 67+300 WSS
Ch 58+600 to ch 59+300 work not yet started
Bhiwandi ROB-CH.56+215.539- View from JNPT End-WSS since 06.01.24
Bhiwandi Pipeline-CH.56+293-Completed
2UPCO-CH.69+396-View from JNPT End-WSS since 31-03-2023
1UPCO-CH.69+005-WIP
1UPCO-CH.69+005-WIP(1)
MNB125D-CH.56+467-Completed
MNB125-CH.56+682-WIP
Viaduct 159 P3
P2605 cage lowering in progress at viaduct 172
JasaiWSS From Ch6+300 to 7+440
Gavan phataIR permit block from 18.55 to 20.00Cutting work in progress at ch11+200
Drilling for pipe roofing in progress at Kundevahal Tunnel South Portal
CTP-11 Kharbao Viaduct I Girder Erection A1 Side Agency Ms Tukaram Crane
CTP-11 Kharbao Viaduct I Girder Erectio
Routine Vertical Load test setup at P2710 at viaduct -172
MNB135A-CH.65+154-WSS
MNB134B-CH.64+318-WSS
MNB133-CH.63+289-YTS
RFO-Kharbao-View from JNPT End- P38-WSS Since 21-02-24
RFO-Kharbao- View from Vaitarna End-P37-WIP
MNRUB128B-CH.59+607-YTS
MNB140-CH.70+304-YTS
MNB140A-CH.70+495-WSS
MNB137D-CH.67+244-WSS
MNB137C-CH.66+870-YTS
MNB137B-CH.66+612-WSS Since 24.02.24
MNB137A-CH.66+410-WSS
MNB136A-CH.66+021.-WSS
MNB130A-CH.60+982-YTS
MNB129-CH.60+523-WSS
MNB128-CH.60+222-WIP
MNB128C-CH.59+461-YTS
MNB128A-CH.59+461-YTS
MNB127D-CH.59+129-WIP
MNB127C-CH.58+926-YTS (No further progress till date)
MNB127B-CH.58+306-WSS Since 15-02-24
MNB127A-CH.58+088-WIP
MNB126B-CH.57+246-WSS (No further progress till date)
MNB126A-CH.56+832-WSS (No further progress till date)
MNB125D-CH.56+467-WIP
MNB125-CH.56+682-WSS since 06-03-24
MNB125C-CH.56+321-WIP
MNB-121D Ch.53+014
MNB-121C Ch.52+905
MNB-121B Ch.52+708
MNB-121A Ch.52+148
MJB139-CH.69+396-View from JNPT End-WIP
MJB138-CH.68+447.94-View from JNPT End-WSS since 13-06-2023 (PSC Solid slab to be commenced & upconnec
MJB138-CH.68+447.94-View from IR Side & Vaitarna End-WSS since 13-06-2023 (PSC Solid slab to be commen
MJB137-CH.67+951.49-(A2)WIP
MJB137-CH.67+951.49-(A1)
MJB-136-CH.65+776.31-WSS since 29.11.23 (View from ROW)
MJB-136-CH.65+776.31-(A1)WSS sice 29.11.23 (Girders stressing,grouting & launching to be commenced)
Minor RUB-121E Ch.53.280
Minor RUB-121 Ch.51+654
Kopar Viaduct -P17-P14-Ch.51+047
Kopar Viaduct -P17-A2-Ch.51+047
Kopar Viaduct -P14-P13-Ch.51+047
Kopar Viaduct -P13-P12-Ch.51+047
Kopar Viaduct -P12-P11-Ch.51+047
Kopar Viaduct -P11-P09-Ch.51+047
Kopar Viaduct -P9-P7-Ch.51+047
Kopar Viaduct -P7-P4-Ch.51+047
Kopar Viaduct -P3-P2-Ch.51+047
Kopar Viaduct -A1-P2-Ch.51+047
Kharvao Viaduct-View from P24 JNPT End
Kharvao Viaduct(A1)-CH.1+622-WIP
Kharvao Viaduct P55 View from Vaitarna End
2UPCO-CH.69+396-View from JNPT End-WSS since 31-03-2023
1UPCO-CH.69+005-WIP
MNB136A-CH.66+021.-WSS
MNB128A-CH.59+461-YTS
MNB127D-CH.59+129-WIP
MNB127A-CH.58+088-WIP
MNB126A-CH.56+832-WSS (No further progress till date)
MNB125D-CH.56+467-WIP
MNB125-CH.56+682-WSS since 06-03-24
MJB138-CH.68+447.94-View from JNPT End-WSS since 13-06-2023 (PSC Solid slab to be commenced & upconnec
MNB126A-CH.56+832-WSS (No further progress till date)
MNB125D-CH.56+467-WIP
ROB DT-1 No work
NP4 pipe erection in progress at MNB-146A
MNB—116 Box errection wip 99108 no’s.
MNB -06 IR existing bridge dismantling completed
MNB -04 IR existing bridge dismantling completed
MJB-114 P-1 piercap wip
MJB-106 ballast retainer wip
MJB 142 work stand still
Kalamboli RFO P-35 Pier cap Rf wip
Kalamboli RFO P-34 pile cap Rf wip
Cross hole test conducted at viaduct 172
Concrete pouring started for IG 08 of MJRUB 146&147B at Nagle PC yard
142B work not yet started
MNRUB133E-CH.63+477-YTS
MNRUB132-CH.61+878-YTS
MNRUB123-CH.54+787-YTS
MNB132B-CH.61+971-WSS since 15-Feb-24
MNB125A-CH.55+955-WSS Since 14-02-24
MNB124-CH.55+317-YTS
MNB124A-CH.55+134-YTS
MNB123A-CH.54+675-WIP
MJB134-CH.63+721-S(A1)WSS since 01.02.24 (Girders stressing,grouting & launching to be commenced)
Work yet to start from Ch52+700 to 53+500
MNB125A-CH.55+955-WSS Since 14-02-24
MNB125A-CH.55+955-WSS Since 14-02-24
MNB -06 IR existing bridge dismantling in progress
Gavan phataIR permit block duration from 18.55 to 20.10Cutting work in progress at ch 11+200
Kundevahal Tunnel South Portal face preparation in progress (2)
WSS Formation work from Ch19+460 to 19+520
Work yet to start from Ch19+520 to 19+700
South Tunnel No work
ROB BHIWANDI – WSS – View from Vaitarna End
ROB BHIWANDI – WSS – View from JNPT End
North Tunnel No lining work due to non availability of waterproofing membrane at site
MJRUB 127 – YTS – View from A1-ROW Corner
MJB 139 – Construction WSS – View from JNPT-IR Corner
MJB 136 – WSS – View from ROW- ROW Corner
MJB 134 – WSS _ View from JNPT End-Row Corner
MJB 125B – WSS – View from ROW
MJB 2 Up Co. Construction WSS – View from JNPT End
Isolated tunnel No work since 16th jan 2024
Gawan phata ROB -work stand still
WSS ch 66+600 to ch 67+300
WSS ch 65+400 to ch 66+200
work not yet started ch 91+025 to ch 91+750
Work not yet started ch 58+600 to 59+200
Kundevahal Tunnel South Portal face preparation in progress
Kundevahal Tunnel South Portal face preparation in progress
MJB125B-CH.56+152-WSS Since 02.02.24(PSC solid slab yet to be commenced)
Bhiwandi ROB-CH.56+215.539- View from JNPT End-WSS since 06.01.24
Bhiwandi Pipeline-CH.56+293-Completed
JasaiWSS From Ch6+300 to 7+440
Kundevahal Tunnel South Portal face preparation in progress1
WSS Formation work from Ch19+460 to 19+520
Work yet to start from Ch19+520 to 19+700
MJRUB -67 A2 side
MJB 169A work stand still.
MJB 147 work stand still
MJB 142 Bridge – Work stand still
JasaiWSS From Ch6+300 to 7+440
Gawan phata ROB -work stand still
Animal overpass 142B not yet started
Kundevahal Tunnel South Portal face preparation in progress2
MJB 139 – Construction WSS – View from JNPT End.
01 Up Co. – WSS since 13-Feb-2024_ View from Vaitarna End
Kundevahal Tunnel South Portal face preparation in progress3
ROB BHIWANDI – WSS – View from JNPT
North deep cut No work
MNRUB-104A raft bottom level excavation done
MNB -65 counter fort Return wall completed
MJRUB 127 – YTS – View from ROW
MJB-119A A1 abutment wip
MJB-114 A1 abutments pier cap wip
MJB-106 ballast retainer wip
MJB-88 A1 abutments and ballast retainer wip
MJB-83 ballast retainer and wearing coat wip
MJB 138 – Main Track – WSS; Up Track – Shoring arrangement in progress; – View from JNPT End
MJB 136 – WSS – View from ROW
MJB 134 – WSS – View from Vaitarna End- ROW Corner
MJB 125B – WSS – View from ROW
MJB 2 Up Co. – Construction WSS – View from JNPT End
Kalamboli viaduct P-20 piercap casting wip
Isolated tunnel No work
Collapsed slopes No work
Central deep cut No work
Kundevahal Tunnel South Portal face preparation in progress4
KoparWork yet to start from DFCC Ch51+400 to 51+660
WSSFrom Ch19+460 to 19+520
Work yet to start from DFCC Ch19+520 to 19+700
Panvel StationReliance Diesel pipe diverted from MNB-68G Near@ch23+650Connectivity done -pipe line issue closed
MNB125A-CH.55+955-WIP
MNB125A-CH.55+955-WIP
MNB137B-CH.66+612-WIP
MNB125-CH.56+682-WSS since 31-01-24 (No further progress till date)
MNB137B-CH.66+612-WIP
MNB125-CH.56+682-WSS since 31-01-24 (No further progress till date)
MNB125-CH.56+682-WSS since 31-01-24 (No further progress till date)
MJB 142 work stand still
MJB 147 work stand still
142B
ROB BHIWANDI – WSS – View from JNPT End
Isolated Tunnel No work
Kundevahal South Tunnel
MJB-114 pier work in progress
MJB-119A work in progress
MJRUB -67
MNB127D-CH.59+129-WSS (No further progress till date)
MNB127B-CH.58+306-WIP
MNB127A-CH.58+088-WIP
MNB126B-CH.57+246-WSS (No further progress till date)
MNB126A-CH.56+832-WSS (No further progress till date)
MNB125D-CH.56+467-WIP
MNB125-CH.56+682-WSS (No further progress till date)
MNB125A-CH.55+955-WIP
RFO-Kharbao-View from JNPT End- P38-WIP
Bhiwandi ROB-CH.56+215.539- View from JNPT End-WSS since 06.01.24
Bhiwandi Pipeline-CH.56+293-Completed
Gawan phata ROB
Kharvao Viaduct(A1)-CH.1+622-WIP
Kharvao Viaduct-CH.68+885-WIP
MNB129-CH.60+523-WSS
MNB128-CH.60+222-WIP
MNB125C-CH.56+321-WIP
MNB124-CH.55+317-YTS
MNB124A-CH.55+134-YTS
MNB123A-CH.54+675-WIP
MNRUB123-CH.54+787-YTS
Kharbao Keymen and type 2 quarters- Work not started
MJB-136-CH.65+776.31-(A1)WSS sice 29.11.23 (Girders stressing,grouting & launching to be commenced)
MJB-136-CH.65+776.31-(A2)WSS since 29.11.23 (Girders stressing,grouting & launching to be commenced)
MJB-136-CH.65+776.31-WSS since 29.11.23 (View from ROW)
2UPCO-CH.69+396-View from JNPT End-WSS since 31-03-2023
MJB-119A abutment A2 excavation wip
MJB137-CH.67+951.49-(A1)
MJB137-CH.67+951.49-(A2)WIP
MJB138~1
MJB139-CH.69+396-View from JNPT End-WSS since 30.03.23
MJRUB127-CH.59+407.50-YTS(1)
Kharvao Viaduct P55 View from Vaitarna End
MNB137D-CH.67+244-WSS
MNB137C-CH.66+870-YTS
MNB137B-CH.66+612-WIP
MNB137A-CH.66+410-WSS
MNB136A-CH.66+021.-WSS
MNB134B-CH.64+318-WSS
MNB134A-CH.64+162-WIP
MNB133D-CH.62+607-WSS
MNB133C-CH.62+507-WSS
MNB133B-CH.62+348-YTS
MNB133A-CH.62+097-YTS
MNB132C-CH.61+929-YTS
MNB132B-CH.61+971-WSS
MNB132A-CH.61+594-YTS
MNB131-CH.61+202-YTS
MNB130-CH.61+037-YTS
MNB130A-CH.60+982-YTS
MNB128C-CH.59+461-YTS
MNB128A-CH.59+461-YTS
MNRUB133E-CH.63+477-YTS
MNRUB132-CH.61+878-YTS
MNRUB128B-CH.59+607-YTS
Kundevahal Tunnel South Portal face preparation in progress5
MNB132C-CH.61+929-YTS
MJB-106 Ballast retainer wip
MJB-114 abutment A1 shutter wip
1st stage stressing start of IG-08 at mjb-142
GAVANP~1
P2605 pile cage lowering in progress at Viaduct 172
MNB140-CH.70+304-YTS
MNB140A-CH.70+495-WSS
MNRUB-106A U trough Rock breaking wip
MNRUB-106A U trough Rock breaking wip
Kundevahal South Tunnel 01
Second layer of wire mesh completed at Kundevahal Tunnel South Portal
2nd stage stressing start of IG-04 at mjb-142
Plate load test started at Viaduct-163D, P15 foundation
MJB-136-CH.65+776.31-(A1)WSS sice 29.11.23 (Girders stressing,grouting & launching to be commenced)
MJB-136-CH.65+776.31-(A2)WSS since 29.11.23 (Girders stressing,grouting & launching to be commenced)
MJB-136-CH.65+776.31-WSS since 29.11.23 (View from ROW)
2UPCO-CH.69+396-View from JNPT End-WSS since 31-03-2023
MJB-119A Abutment A1 pier casting wip
MJB125B-CH.56+152-WSS Since 02.02.24(PSC solid slab yet to be commenced)
MJB134~1
MJB134-CH.63+721-S(A1)WSS since 01.02.24 (Girders stressing,grouting & launching to be commenced)
MJB138~1
MJB139-CH.69+396-WSS since 30.03.23
Bhiwandi ROB-CH.56+215.539- View from JNPT End-WSS since 06.01.24
IG-41 Girder concrete started at viaduct 152 & 153
Second layer wire mesh fixing in progress at Kundevahal Tunnel South Portal
Kharbao Viaduct – A1 Side – Span A1-P1 – I-Girder No. 03 – 1.7m
Kharbao Viaduct – RFO Span (P37-P38) – (1.8m dia. Pile)
MJB-114 P1 pier shutter wip 1st lift
MJB-119A abutments A1 (6th lift ) shutter wip
P37-CH.1+622-WIP
Span P15-P16-Ch.51.047-51+247-WIP
Span P16-P17-Ch.51+047-51+247-WIP
MNB136A-CH.66+021.-WSS
MNB135A-CH.65+154-WSS
MNB133A-CH.62+097-YTS
MNB132C-CH.61+929-YTS
MNB131-CH.61+202-YTS
MNB130-CH.61+037-YTS
MNB130A-CH.60+982-YTS
MNB128A-CH.59+461-YTS
MNB125C-CH.56+321-WIP
MNRUB133E-CH.63+477-YTS
MNRUB132-CH.61+878-YTS
MNRUB128B-CH.59+607-YTS
MNRUB-121-Ch.51+654-YTS
Isolated Tunnel No work
Isolated Deep cut WIP
North tunnel south portal No work
North tunnel north portal wip
North deep cut Wip
South tunnel south portal No work
South tunnel North portal -WIP
MJB-114 Kalyan
MJB-136-CH.65+776.31-(A1)WSS
MJB-136-CH.65+776.31-(A2)WSS
MJB-106
MJB-114.
MJB-119B-Ch.50+300-YTS
MJB134-CH.63+721-(A2)WSS
MJB134-CH.63+721-S(A1)WSS
MJB137-CH.67+951.49-(A1)
MJB137-CH.67+951.49-(A2)WIP
MJRUB127-CH.59+407.50-YTS
Gawan phata ROB work stopped since 02.02.24
1UPCO-CH.69+005-WIP
Kharvao Viaduct-CH.68+885-WIP
KHARVAOVIADUCT(A1)-CH.1+622-WSS
P38-CH.1+622-WSS
A2-Ch.51+247-WIP
Span A1-P2-Ch.51+047-51+247-WSS
Span P3-P7-Ch.51+047-51+247-WSS
Span P8-P10-Ch.51+047-51+247-WIP
Span P10-P12-Ch.51+047-51+247-WIP
Span P12-P14-Ch.51+047-51+247-WIP
Span P14-P15-Ch.51+047-51+247-WIP
Span P17-A2-Ch.51+047-51+247-WIP
MNB-121A-Ch.52-148-WSS
MNB-121B-Ch.52+708-YTS
MNB140-CH.70+304-YTS
MNB137D-CH.67+244-WSS
MNB140A-CH.70+495-WSS
MNB137C-CH.66+870-YTS
MNB137B-CH.66+612-WIP
MNB137A-CH.66+410-WSS
MNB134B-CH.64+318-WSS
MNB134A-CH.64+162-WIP
MNB133D-CH.62+607-WSS
MNB133C-CH.62+507-WSS
MNB132A-CH.61+594-YTS
MNB129-CH.62+348-YTS
MNB129-CH.60+523-WSS
MNB128-CH.60+222-WIP
MNB128C-CH.59+461-YTS
MNB127D-CH.59+129-WSS
MNB127C-CH.58+926-YTS
MNB127B-CH.58+306-WIP
MNB127A-CH.58+088-WIP
MNB126B-CH.57+246-WSS
MNB126A-CH.56+832-WIP
MNB125D-CH.56+467-WIP
MNB125-CH.56+682-WIP
MNB125A-CH.55+955-WIP
MNB124-CH.55+317-YTS
MNB124A-CH.55+134-YTS
MNB123A-CH.54+675-YTS
MNB-121D-Ch.53+014-YTS
MNB-121C-Ch.52+905-YTS
MNB127C-CH.58+926-YTS (No further progress till date)
MRUB-106A Rock breaking -WIP
MNRUB123-CH.54+787-YTS
MNRUB-121E-Ch.53+280-YTS
MJB 136 – View from ROW – WSS
2UPCO-CH.69+396-WSS
MJB125B-CH.56+152-WSS
MJB 134 – View from Vaitarna- ROW corner- WSS
MJB138-CH.68+447.94-WSS
MJB139-CH.69+396-WSS
MJB 147 -WSS
MJB 169A -WSS
MJRUB 127 – View from JNPT-ROW End – YTS
MJRUB 127 – View from VAITARNA-ROW End – YTS
ROB Bhiwandi – View from JNPT End – WSS
ROB Bhiwandi – View from Vaitarna End – WSS
Bhiwandi Pipeline-CH.56+293-Completed
6. JNPT Tower Wagon She’d- work not started
5. JNPT Staff quarters Type 3-(YTS)
4. JNPT Staff quarters Type 2 and Keymen- (YTS)
3. JNPT Relay Hut- West (YTS)
2. JNPT Relay hut East- (YTS)
1. JNPT IMD Building- Work not started
Kharbao Type 3 quarters- work not started
Kharbao Tower Wagon Shed- Work yet to start
Kharbao Relay hut West- work not started
Kharbao Relay hut- East
Kharbao IMD Building- Work not started
Nilje quarters Type 3- work not started
Nilje quarters Type 2- Work stopped since 18.06.2022
Nilje MMU building- work not started
Nilje Keymen- work stopped since 06.02.2022
07.02.2024
North Deep cut No work P-1
05.02.2024
02.02.2024
MJRUB -67 work stand still since 27.01.24 ( backfilling work ).
Kharbao Service Building- Work not started
IG-17 girder shuttering work in progress. Kopar viaduct.
WSS between ch 58+100 to ch 58+600
WSS between ch 58+100 to ch 58+800
WSS between ch 58+100 to ch 59+00
WSS between ch 58+600 to ch 59+100
WSS between ch 58+800 to 59+100
WSS between ch 60+650 to ch 61+050
WSS between ch 61+600 to ch 61+900
WSS between ch 63+300 to ch 63+700
WSS between ch 65+200 to ch 65+900
WSS between ch 66+800 to ch 67+300
WSS between ch 73+600 to ch 79+900
WSS between ch 77+850 to ch 78+200
WSS between ch 78+600 to ch 78+900
WSS between ch 81+500 to ch 81+950
WSS between ch 84+00 to ch 84+460
WSS between ch 84+100 to 84+520
WSS between ch 84+100 to ch 84+500
WSS between ch 84+100 to ch 84+600
WSS between ch 84+400 to. ch 84+760
WSS between ch 84+500 ch 84+750
WSS between ch 86+350 to ch 87+00
WSS between ch 86+470 to ch 86+800
WSS between ch 86+500 to ch 87+060
WSS between ch 86+500 to ch 87+100
WSS between ch 96+700 to 97+200
WSS between ch 96+700 to ch 97+200
WSS ch 73+200 to ch 73+800
WSS ch 96+700 to ch 97+200
Work in progress IR existing bridge dismantling and stone column completed
Work yet to start from Ch19+520 to 19+700
Work yet to start from Ch19+520 to 19+700
Work yet to start from Ch19+520 to 19+700
Work yet to start from Ch19+520 to 19+700 (2)
Work yet to start from ch19+520 to 19+700.
work not yet started between ch 58+600 to ch 59+050